📞0333 772 3030 💬WhatsApp ✉️发送邮件

活动与节庆停车场

Temporary parking on grass that survives the weekend, the weather and several thousand vehicles, and leaves the field usable afterwards.

重要性说明

为什么此处需要加固

Event parking concentrates a season's worth of traffic into a few days, often in unpredictable weather, on ground with no time to recover. Reinforcement is the difference between a field you can reuse next year and a recovery operation with a tractor. It also removes the liability of vehicles becoming stuck on site.

适用场景

Festival parking
Show grounds
Sports events
Country fairs
Wedding venues
Temporary access routes
产品规格

快速概览

Sub-base50-100mm MOT Type 1, more on entrance and exit routes
InfillRootzone and grass, so the field returns to normal use between events
Typical loadingCars and light vans in volume, in all weathers
PermeabilityFully permeable. Normally treated as a SuDS component in a drainage strategy.
Design life25 years, subject to documented installation.
Material100% recycled polypropylene, made in the UK.
安装

安装步骤

  1. Mark out the area and excavate to the depth of your sub-base plus the grid depth plus your infill blinding.
  2. Lay a woven geotextile across the formation, lapping joins by at least 300mm. This stops the sub-base and the subsoil mixing.
  3. Lay and compact the sub-base: 50-100mm MOT Type 1, more on entrance and exit routes. Compact in layers rather than all at once.
  4. Blind the sub-base with a thin layer of grit sand and screed it level. This is what gives you a flat finished surface.
  5. Push-fit the grids together across the area, working from one edge. Cut around obstacles with a jigsaw or fine-tooth saw.
  6. Fill the cells: Rootzone and grass, so the field returns to normal use between events. Work the fill in with a stiff brush so no cell is left hollow.
  7. Check the finished level. Nothing should stand proud of the cell walls, and no cell should be left under-filled.

Most installations are straightforward groundwork. The grids themselves push-fit together and need no fixings, adhesive or specialist tools.

系统选型

选择哪种格栅厚度?

The 40mm general duty grid across the parking field, so the grass recovers between events. The 30mm heavy duty grid on entrance, exit and marshalling routes, where every vehicle on site passes.

If you are between two options, take the heavier duty one. The cost difference across a typical project is small next to the cost of lifting and relaying a surface that was under-specified.

一次做对

最常见的错误

Reinforcing the field but not the entrance. Every vehicle on site passes through the gate, so it takes many times the traffic of any parking bay.

常见问题

Can it be installed temporarily?

The system is designed as a permanent installation, but many venues install it once on the regular parking field and use it every season.

How quickly can it be laid?

Grids interlock and push-fit, so large areas go down quickly with a small team.

What happens if it rains all weekend?

Confinement stops saturated ground shearing under tyres, which is the failure mode that strands vehicles.

Will the field recover for grazing or hay?

Yes. Grass grows through the cells and the field remains in agricultural use between events.

How many vehicles can we take?

Roughly 350 to 400 cars per hectare including circulation. Confirm against your event management plan and emergency access requirements.

What happens in a genuinely wet year?

Confinement stops saturated ground shearing under a tyre, which is the failure that strands vehicles and needs a tractor.

咨询我们的工程师

关于深度、基层、边缘处理或适合您项目的系统有任何疑问?请在下方提问。

您的购物车
总计£0.00

通过Stripe安全付款。税费根据目的地在结账时计算。