📞0333 772 3030 💬WhatsApp ✉️发送邮件

农场道路与田地入口

Stone that stays put under tractor, trailer and livestock traffic, on the gateways and tracks that turn to soup every winter.

重要性说明

为什么此处需要加固

A farm track fails at the entrance first. Stone pushes into soft subsoil, the surface hollows, water collects and the hole deepens every time a loaded trailer goes through. A grid holds the stone above the subgrade and spreads axle loads across the full width instead of concentrating them in two ruts.

适用场景

Field entrances
Farm tracks
Yard approaches
Silage clamp aprons
Livestock races
Feed passage approaches
产品规格

快速概览

Sub-base150-250mm MOT Type 1 over a woven geotextile, depending on axle loading
InfillAngular 20-40mm crushed stone, filled level and blinded
Typical loadingTractors, loaded trailers and livestock
PermeabilityFully permeable. Normally treated as a SuDS component in a drainage strategy.
Design life25 years, subject to documented installation.
Material100% recycled polypropylene, made in the UK.
安装

安装步骤

  1. Mark out the area and excavate to the depth of your sub-base plus the grid depth plus your infill blinding.
  2. Lay a woven geotextile across the formation, lapping joins by at least 300mm. This stops the sub-base and the subsoil mixing.
  3. Lay and compact the sub-base: 150-250mm MOT Type 1 over a woven geotextile, depending on axle loading. Compact in layers rather than all at once.
  4. Blind the sub-base with a thin layer of grit sand and screed it level. This is what gives you a flat finished surface.
  5. Push-fit the grids together across the area, working from one edge. Cut around obstacles with a jigsaw or fine-tooth saw.
  6. Fill the cells: Angular 20-40mm crushed stone, filled level and blinded. Work the fill in with a stiff brush so no cell is left hollow.
  7. Check the finished level. Nothing should stand proud of the cell walls, and no cell should be left under-filled.

Most installations are straightforward groundwork. The grids themselves push-fit together and need no fixings, adhesive or specialist tools.

系统选型

选择哪种格栅厚度?

The 30mm heavy duty grid. Loaded trailers on soft ground are the most demanding case we specify for, and this is the grid built for it.

If you are between two options, take the heavier duty one. The cost difference across a typical project is small next to the cost of lifting and relaying a surface that was under-specified.

一次做对

最常见的错误

Omitting the geotextile on soft ground. Without separation, the stone works down into the subsoil and the track needs re-stoning every couple of years.

常见问题

Will it take a loaded grain trailer?

Yes, with an appropriate sub-base. Design the depth for the heaviest axle load, not the average one.

How does it stop stone disappearing into the mud?

The cell structure holds the stone in a defined layer, and a geotextile below stops the stone and subsoil mixing.

Is it suitable for livestock?

Yes, when filled level and blinded so no cell wall stands proud.

Can I lay it over an existing stoned track?

Usually yes, provided the existing stone is regraded and properly compacted first.

How far back from the gate should I surface?

At least five metres each side, and more on the field side where turning happens. Anything less and the poaching just moves.

Can I use recycled crushed concrete as sub-base?

Yes, if it is clean and well graded. Check it is free of reinforcement and fines that will bind and hold water.

咨询我们的工程师

关于深度、基层、边缘处理或适合您项目的系统有任何疑问?请在下方提问。

您的购物车
总计£0.00

通过Stripe安全付款。税费根据目的地在结账时计算。